This Old House S23E19 · The Manchester House - 19

Air date: 2002-01-26

← Episode 18 Episode 20 →

Watch now

Overview

Roger Cook and crew enclose the new spa in veneer stone, while inside homeowner Janet McCue has roped two friends into helping her complete the srtipping and reglazing of the half-round bump-out windows, no small job. The music room recives its final, finish coat of accoustical plaster, and our master carpenter checks out a new four-oscillating-head sander that flooring contractor Pat Hunt is using. Richard visits Kohler, Wisconsin, to see how one company has used computer-aided engineering to design a toilet ""engine"" that meets the challenge of using only 1.6 gallons per flush. Back at the house, Tom shows Steve a flexible molding that bends around the radius of the kitchen bay and matches perfectly with the wooden moldings on the straight runs. Finally, our master carpenter takes measurements for the music room inglenook, making a set of layout sticks he can use in the workshop to accurately reflect conditions in the field.

Torrents

Searching torrents…

Subtitles

…

Episodes

  1. 1 1. The Manchester House - 12001-09-22Steve and our master carpenter approach the latest project house by water, finding a convenient dock at the base of the property. They meet Janet McCue, who is busy supervising the
  2. 2 2. The Manchester House - 22001-09-29The day starts off with the landscaping works of Roger Cook. He and his crew cut down a few trees that were threatening the house, have move a dozen or so rhododendrons and azaleas
  3. 3 3. The Manchester House - 32001-10-06Steve sees the seaside public rotunda and ""chowder house"" our subject property looks out on, with Manchester Historical Society president John Huss as guide. At the house, nearly
  4. 4 4. The Manchester House - 42001-10-13With the new concrete walls poured, it's time to damp-proof them, just one more in a series of tasks that adds up to nearly $30,000 for the new foundation - which is simply the cos
  5. 5 5. The Manchester House - 52001-10-20The foundation has been backfilled and carpenters are busy putting up the forms for the new terrace. Inside, the area for the new kitchen and family room has been completely opened
  6. 6 6. The Manchester House - 62001-10-27Steve finds our master carpenter in the new jobsite office trailer, complete with secure storage - good for keeping paperwork safe from the work going on inside the house and for k
  7. 7 7. The Manchester House - 72001-11-03Steve tries his hand at driving the jobsite forklift, successfully (if shakily) delivering a load of plywood to the thir floor. Inside, he and Tom discuss their concerns about the
  8. 8 8. The Manchester House - 82001-11-10Our new roof is going on, and our master carpenter talks to roofing contractor Mark Mulloy about the system: decking, bitumen membrane covering every surface from eave to ridge, a
  9. 9 9. The Manchester House - 92001-11-17Steve sees the progress on the new addition, including a roof joist system of 1 x 12 LVLs, necessitated by the room's high ceiling height. Inside, Tom and our master carpenter show
  10. 10 10. The Manchester House - 102001-11-24Steve begins the show in a municipal parking lot in Ipswich, Massachusetts, where once stood a beautiful 250-year-old Georgian home. Later in the show, he takes viewers to the Smit
  11. 11 11. The Manchester House - 112001-12-01From the shoreline, Steve sees the rapidly improving look of the house, which has now regained its missing wing and dormers, and is starting to have its new front porches put on. T
  12. 12 12. The Manchester House - 122001-12-08There's been major progress on the job, as Steve sees the new bays and porch deck on the sea side of the house, Tommy and our master carpenter begin shingling with red cedar shingl
  13. 13 13. The Manchester House - 132001-12-15Roger Cook and crew have begun to tear up the old asphalt driveway in preparation for a newly configured one. Painter John Dee shows Steve his approach to restoring the turn-of-the
  14. 14 14. The Manchester House - 142001-12-22Our master carpenter sees how the faulty east chimney has been fixed by specialist Mark Schaub and his crew: the game room fireplace is bricked over, but the guest room above gets
  15. 15 15. The Manchester House - 152001-12-29The last of the ipe decking is arrived, Steve and our master carpenter check out the installation method on the front deck: pressure-treated sleepers spiked into the concrete slab,
  16. 16 16. The Manchester House - 162002-01-05The last of the wallbaord has arrived, including 1/4"" bendable board for the music room's curved ceiling. Lighting designer Susan Arnold shows Steve the many choices in recessed d
  17. 17 17. The Manchester House - 172002-01-12Steve drived down to the house, checking out the newly open vistas of the house and yard through the newly bare trees along the road. Inside, ths study and dining room are shaping
  18. 18 18. The Manchester House - 182002-01-19The new spa arrives on the back of the truck; placed on concrete pad, plugged in and filled with a hose, it's soon open for business. Tom begins installing the new beautiful wood p
  19. 19 19. The Manchester House - 192002-01-26Roger Cook and crew enclose the new spa in veneer stone, while inside homeowner Janet McCue has roped two friends into helping her complete the srtipping and reglazing of the half-
  20. 20 20. The Manchester House - 202002-02-02An asphalt grinder makes quick work of the old driveway, truning blacktop into a gravel mix that will serve as a bed for the new, reconfigured drive. Inside, Mark Schaub shows Stev
  21. 21 21. The Manchester House - 212002-02-09Roger Cook mulches the planting areas around the finished spa; bushes will give it some privacy. In the dining room, Tommy puts up the final pieces of an elaborate, 11-piece ceilin
  22. 22 22. The Manchester House - 222002-02-16In the music room, our master carpenter begins to install the first pieces of inglenook, while Steve gets a look at the wiring, fuse panels, and emergency backup power unit for the
  23. 23 23. The Manchester House - 232002-02-23Mud season has arrived early in Manchester, and Steve pulls our producer out of the mud to start the show. In the mudroom, Joe Ferrante lays 6 x 6 Chinese slate, while our master c
  24. 24 24. The Manchester House - 242002-03-02As our completion deadline draws near, the house is abuzz with activity. Flooring contractor Pat Hunt installs a lazer-cut wood floor medallion in the shape of a compass rose, whil
  25. 25 25. The Manchester House - 252002-03-09A last arrival by boat reveals to Steve and our master carpenter how far we've come from the plain shingled box we found on Day 1 of this project, and Steve declares he'll be satis
  26. 26 26. The Manchester House - 262002-03-16The final days in Manchester begin with a look at the smoke detectors - specialist Greg Smizer explains to Steve maintenance obsolescence issues, and points out that the ones he's